Sorry I found no matches, Please try again. 176
vid = 2964pws_id = 354065pws_id = 354065
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.219.205.202 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Hyndburn Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Hyndburn Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Hyndburn Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, oswaldtwistle    
Type of installation: Wind    on/offshore: on
Turbines :12  Capacity : 24.6 MW
Approx Date of 1st power generation: October 2012

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

In May 2007 Energiekontor consulted on a proposal to build a 24 turbine wind farm with a height to blade tip of up to 130m on Haslingden and Oswaldtwistle Moors. The proposed wind farm was provisionally named Haslingden Moor Wind Farm. As a result of the consultation process and findings of the environmental studies the proposed scheme has been reduced to 12 turbines with a height to blade tip of up to 122m on Oswaldtwistle Moor only which is now called the Hyndburn Wind Farm.

It is estimated that the 12 turbine Hyndburn Wind Farm would generate up to 72.2 million kWh of electricity per year which is the equivalent to the estimated electricity requirements of 52% of the households within Hyndburn*.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Energiekontor UK Ltd 4330 Ground Floor Park Approach Thorpe Park Leeds LS15 8GB

 Associated Companies.

Relationship Company (For: Hyndburn )
DeveloperEnergiekontor
OwnerEnergiekontor

 DECC Data on this Project: Hyndburn :-na-

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Hyndburn Wind Farm Extension     8.2 MW
Energy Type: Wind Onshore
County: Lancashire     Country: England     LPA: Hyndburn Borough Council
Site ID and Reference: 4384 / B1462     District:
Applicant: Energiekontor UK     Application : 11/14/0244 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 4 Turbine Capacity: 2.0499999999999998
Height of Turbines: 122 Calculated capacity: 8.2
Site Address: Land at Oswaldtwistle Moor Off B6236, Haslingden Road, Accrington
 
County: Lancashire Region: North West
OS Coordinates: 374720 / 374720
Development Status: Planning Permission Granted
Application Submitted: 7/7/2014 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live This Record Last Updated: 8/20/2020
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 6/26/2018    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Hyndburn Wind Farm     24 MW
Energy Type: Wind Onshore
County: Lancashire     Country: England     LPA: Hyndburn Borough Council
Site ID and Reference: 3748 / A0541     District:
Applicant: Energiekontor UK     Application : 11/09/0512 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 12 Turbine Capacity: 2
Height of Turbines: Calculated capacity: 24
Site Address: Hyndburn Wind Farm on Oswaldtwistle Moor
 
County: Lancashire Region: North West
OS Coordinates: 374424 / 374424
Development Status: Operational
Application Submitted: 12/1/2009 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 4/1/2012    
Generator Live 10/19/2012 This Record Last Updated: 5/3/2013
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Hyndburn: Wind : -na-

 Calculations


Capacity: 48
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 12 m/s (26.844 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 5/16/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 48 start: 5 Optimum: 15/ Stop: 12 / wind: / ratio 354065

Project Info
HYNDBURN Wind Farm Infill Extension
Energiekontor is delighted that HYNDBURN Borough Council has approved an application for a further four infill wind turbines at Haslingden Moor.

Energiekontor UK Ltd: Projects

HYNDBURN Wind Farm website

REpower supplies 43.05 MW of wind turbines to Energiekontor UK
The wind turbines will be installed at Energiekontor UK’s wind farms at Withernwick, Yorkshire, and HYNDBURN on Oswaldtwistle Moor, Lancashire.

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School