Loading
Page views this IP this session = 1 of 10 unsubscribed pagesHyndburn Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Hyndburn Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Hyndburn Wind Farm (Wind , Active) Location in the UK : England, oswaldtwistle Type of installation: Wind on/offshore: on Turbines :12 Capacity : 24.6 MW Approx Date of 1st power generation: October 2012
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
In May 2007 Energiekontor consulted on a proposal to build a 24 turbine wind farm with a height to blade tip of up to 130m on Haslingden and Oswaldtwistle Moors. The proposed wind farm was provisionally named Haslingden Moor Wind Farm. As a result of the consultation process and findings of the environmental studies the proposed scheme has been reduced to 12 turbines with a height to blade tip of up to 122m on Oswaldtwistle Moor only which is now called the Hyndburn Wind Farm.
It is estimated that the 12 turbine Hyndburn Wind Farm would generate up to 72.2 million kWh of electricity per year which is the equivalent to the estimated electricity requirements of 52% of the households within Hyndburn*.
For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register Energiekontor UK Ltd 4330 Ground Floor Park Approach Thorpe Park Leeds LS15 8GB
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Hyndburn Wind Farm Extension 8.2 MW
|
Energy Type: |
Wind Onshore |
County: |
Lancashire Country: England LPA: Hyndburn Borough Council
|
Site ID and Reference: |
4384 / B1462
District:
|
Applicant: |
Energiekontor UK
Application :
11/14/0244
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
4 |
Turbine Capacity: |
2.0499999999999998 |
Height of Turbines: |
122 |
Calculated capacity: |
8.2 |
Site Address: |
Land at Oswaldtwistle Moor Off B6236, Haslingden Road, Accrington
|
|
|
County: |
Lancashire Region: North West
|
OS Coordinates: |
374720 / 374720
|
Development Status: |
Planning Permission Granted
|
Application Submitted: |
7/7/2014
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
8/20/2020
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
6/26/2018 |
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Hyndburn Wind Farm 24 MW
|
Energy Type: |
Wind Onshore |
County: |
Lancashire Country: England LPA: Hyndburn Borough Council
|
Site ID and Reference: |
3748 / A0541
District:
|
Applicant: |
Energiekontor UK
Application :
11/09/0512
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
12 |
Turbine Capacity: |
2 |
Height of Turbines: |
|
Calculated capacity: |
24 |
Site Address: |
Hyndburn Wind Farm on Oswaldtwistle Moor
|
|
|
County: |
Lancashire Region: North West
|
OS Coordinates: |
374424 / 374424
|
Development Status: |
Operational
|
Application Submitted: |
12/1/2009
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
4/1/2012
|
|
|
Generator Live |
10/19/2012
|
This Record Last Updated: |
5/3/2013
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Capacity: 48 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 12 m/s (26.844 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 5/16/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|